The CDC is the largest data centers in the Middle East and is classified as a mission critical facility. This project includes engineering, procurement, construction, testing and commissioning of a fully operational Tier IV Corporate Data Center (CDC). The facility is fully equipped with state-of-the-art air conditioning, fire protection systems and uninterruptible power supply.
Taab scope is not limited but includes the following;
electrical equipment systems include 13.8 kV, 4.16 kV, and 480 V switchgears and transformers,2 MW 13.8 kV Diesel Generators, 480 V MCCs, UPS and Battery systems, Programmable Logic Controllers(PLCs).Power Distribution Units (PDU’s),Remote Power Panels (RPPs) and rectifiers and battery systems.Electrical Power Monitoring (EPMS) Systems.48Km of duct bank for MV Cable laying works.HVAC system includes chilled water Plant, Cooling Towers, Air Handling Units, CRAH’s, Chilled water piping and Control systems.A Thermal Storage Tank with a capacity to provide cooling during the UPS battery discharge, 4,000 ton hours for cooling backup.A direct digital building automation system (BAS).Internal and external firefighting systemPlumbing / drainage system for storm water, sewage & potable water network