Project is on Re-measurable basis consists of Main Hospital Building, Technical Plant,Recreation Center, male and female nurse staff housing, RO plant, sewage treatment plant, service building, Mosque and Guard Houses.
Taab scope is not limited but includes the following;
HVAC System with 9 air cooled chillerPrimary & secondary chilled water pumps & chilled water piping systems.Firefighting network including CO2, FM200 SystemsMedical gas systemLPG systemBoiler and steam networkPower distribution system in the buildingExternal & internal lighting systemLow voltage network, 988 panel boards, synchronization panelMV Network with 15 package substation, 6 dry type transformer, 2 switch gearsLow current system Telephone, Data, BMS, Fire Alam, public address, nurse call etc.