Work includes construction of Luxury Hotel located in a prime spot on the Al-Khobar cornice which directly overlooks the Arabian Gulf. Project includes 11 floors above ground floors.
Taab scope is not limited but includes the following;
HVAC System with air colled chillers & chilled water pump roomComplete fire fitting systemMEP for kitchen & laundry (Plumping & drainage network with lifting station)Power distribution networkLighting systemLow current system (BMS, FA, CCTV, Etc.)